Build a repeatable cost estimate using filament, power, machine wear, labour and fulfilment.

A slicer tells you how much material and machine time a job needs. It does not tell you what the finished product costs to sell. A useful quote starts with the whole job, then spreads shared costs across the items that are actually saleable.

Start with material you really consume

Multiply the batch weight in grams by the spool price, then divide by the spool weight. A 120 g batch from a $25, 1,000 g spool uses $3 of filament. If that weight excludes purge, supports or setup waste, add an allowance. A 10% allowance makes the material estimate $3.30. If the slicer already includes all that waste, leave the extra allowance at zero to avoid counting it twice.

Add power and machine time

Electricity cost is watts ÷ 1,000 × hours × price per kWh. At an illustrative average of 120 W, a six-hour batch uses 0.72 kWh. At $0.18/kWh, that costs about $0.13. These are example inputs, not a standard for every printer. Measure average consumption over a complete representative print when possible.

A machine-hour allowance can recover wear and replacement costs. For example, a $1,000 printer spread over an assumed 4,000 productive hours contributes $0.25/hour before maintenance. Use your own expected life and avoid recovering the same expense twice in separate allowances.

Pay for hands-on work

Count setup, removing supports, assembly, quality checks and preparing the order. Fifteen minutes at $20/hour costs $5 for the batch. Printing time and labour time are separate: six hours of unattended printing do not automatically mean six billable labour hours.

Divide shared costs, then add per-item costs

Enter total batch weight, total batch print time and total batch labour in 3D PrintMargin. Set the number of items produced. Packaging and fulfilment are entered per item. For a four-item batch, a $5 labour cost becomes $1.25 per item; $0.75 of per-item packaging stays $0.75.

Use the failed-batch rate for production losses, then add selling fees and a target margin. The result is a cost-based starting price. Compare it with actual customer demand and your records rather than assuming every product is profitable at that price.

Build a job card before setting a price

Keep a repeatable record with the file revision, material, slicer profile, total batch grams, machine hours, active minutes, rejects and saleable quantity. Measure three representative runs before treating one successful print as typical. A plate can look efficient in the slicer while requiring more support removal and quality checks than a smaller batch.

RecordWhat to captureHow it informs the quote
MaterialSpool purchase price and usable gramsUse delivered cost consistently; do not count supports twice
ProductionElapsed print hours and energy meter kWhReplace assumed wattage with an observed average
FinishingMinutes removing supports, assembling and checkingPay active labour separately from machine time
FulfilmentPackaging and seller-paid postageAssign per item or divide shared order costs

Close the loop after delivery

Compare the estimate with the completed job card. If a six-hour estimate becomes seven hours but hands-on work falls from 25 to 10 minutes, the labour saving may outweigh the extra machine cost. Update the input that actually changed. Do not hide all errors in a larger material markup. Use the machine-hour rate tool to build an allowance and the complete calculation to trace each cost.

Run the numbers for your own print