P3D PrintMargin
3D PRINTING BUSINESS WORKSHOP

Machine-hour allowance builder

Build an equipment recovery allowance from usable life, maintenance and assigned operating overhead.

currency
currency
currency
hours
currency
hours

Method: recover cost over productive hours

Equipment recovery/hour = (purchase + lifetime maintenance − residual value) ÷ productive lifetime hours.
Assigned overhead/hour = monthly assigned overhead ÷ monthly productive hours.
Combined allowance = equipment recovery/hour + assigned overhead/hour.

Residual value must not exceed purchase cost. Productive hours means hours over which costs are recovered, not every hour the printer is owned. This is an internal pricing allowance and does not calculate tax depreciation, loan interest or a permitted deduction.

Worked example: a $1,000 printer

Purchase and setup cost of $1,000, a $100 residual value, a $300 maintenance budget and 4,000 productive hours produce a $0.30 hourly equipment allowance. Allocating $20 monthly overhead over 100 productive hours adds $0.20/hour, for $0.50/hour combined. If the monthly hours fall to 50, that overhead component rises to $0.40/hour.

Transfer the result carefully

Enter the combined result in “Machine wear / hour” on the pricing calculator if you want that field to recover these expenses. Leave electricity and active labour out of this tool; those have their own calculator inputs. Do not also place the same overhead in the break-even planner’s fixed expenses.

Review the assumptions

A printer may still work beyond the planning lifetime or need replacement sooner. Keep actual maintenance receipts, distinguish upgrades from routine consumables, and revisit useful life as your production mix changes. The model spreads costs evenly and does not predict the timing of cash payments.

Inputs are not saved between visits. Export the current result before closing the page. Read the methodology and privacy information.