Batch pricing and profit per printer-hour
Compare production batches using total cost, saleable quantity and the printer time needed to earn profit.
A product that earns more per item is not always the best use of a busy printer. Batch size, total print time and saleable output determine how efficiently the machine generates profit.
Enter totals for the whole plate
For a plate containing four products, enter the material and print time for all four together. Enter total hands-on labour for the batch as well. Set “Items per batch” to four. The calculator divides shared production and labour costs by four, then adds packaging and fixed selling fees per item.
Do not enter one item’s weight with four items in the quantity field. That divides the material cost again and understates your estimate. Likewise, a four-item batch is not automatically four times the print time of one item; use the sliced batch time.
Compare capacity, not just unit profit
Consider two illustrative jobs with no failures. Product A earns $5 per item and produces four items in eight hours: $20 ÷ 8 = $2.50 profit per printer-hour. Product B earns $3 per item and produces six items in four hours: $18 ÷ 4 = $4.50/hour. Product B produces more profit for the same machine time, provided there is enough demand to sell it.
3D PrintMargin adjusts the time denominator for its full failed-batch model. At a 10% failure rate, an eight-hour successful batch is allocated 8 ÷ 0.90 = 8.89 expected printer-hours.
Batching does not remove per-item work
A larger batch may share setup time, but sanding, assembly and packing can still scale with quantity. Enter labour for the actual batch rather than assuming it stays constant. Packaging is charged per item in this calculator.
Fixed marketplace fees may apply per order rather than per item. For an order with several identical items, divide a genuine per-order fixed charge across those items before entering the per-item field. Check the marketplace rules: a per-item listing cost behaves differently.
Use the metric within its limits
Profit per printer-hour measures production capacity under your entered assumptions. It does not account for idle days, unsold stock or demand limits. A high hourly result on a product nobody buys has little practical value. Compare it alongside sales frequency, reliable output and how much cash inventory ties up.
Before committing a large batch, test a smaller order and verify the real print time, labour and quality. Then use the measured batch as your next pricing baseline.
Account for the time a plate waits
An eight-hour print does not guarantee three completed batches per day. Removal, cooling, setup and an unattended overnight finish can hold the printer after extrusion stops. A job that finishes at 2 a.m. may wait until morning for a changeover. Use occupied time in scheduling even when the pricing calculator models only print time.
Capacity is not a sales forecast
If you have 120 available printer-hours, an 80% scheduling utilization assumption and four-hour batches, you have 96 scheduled hours. At 90% successful batches and six parts per plate, expected output is floor(96 ÷ 4 × 0.90 × 6) = 129 items. Real output is lumpy: batches finish in whole units, and downtime can cluster. The capacity planner distinguishes average expected output from a promised delivery date.
Protect the bottleneck
Compare products using contribution per occupied printer-hour, then check finishing hours as a second constraint. A higher-price product can be worse if it consumes most of the week’s machine time. If both items need the same employee for sanding, machine capacity alone will overstate what the shop can ship.
Run the numbers for your own print
Use your actual costs and batch size to calculate a price and profit estimate.
Open the free calculator