Estimated versus actual print cost tracker

Reconcile a completed batch, find cost overruns and keep a private browser-local job log.

The starting numbers are illustrative and are not a completed Shipshrecked order. Enter your own observations. Records are saved in this browser only when you choose Save; download a backup to keep a durable copy.

currency
g
hours
minutes
g
currency/kg
kWh
currency/kWh
hours
currency/hour
minutes
currency/hour
currency
items
currency
currency

Your saved job records

Stored only in this browser on this domain. Browser clearing, private mode or changing devices can remove access. Importing a backup adds records; it does not upload them.

Method: reconcile the whole completed job

Actual cost = material grams ÷ 1,000 × material cost/kg + measured kWh × electricity rate + occupied hours × machine allowance + active minutes ÷ 60 × labour rate + other batch costs. Unit cost = actual cost ÷ saleable items. Profit = actual batch revenue − actual cost − actual fees. Cost variance = actual cost − estimated cost; percent variance divides by estimated cost when it is positive.

Use actual failures, not a second reserve

Include the material, energy, time and labour of every failed attempt in the actual totals. Do not add an estimated failure allowance to these measured costs. Record actual saleable units after defects and rework. If nothing was saleable, unit cost is undefined while the incurred batch cost remains meaningful.

Worked example and interpretation

The default actual material cost is $3.50, energy is $0.144, machine allowance is $1.625, labour is $6.666667… and other costs are $3. Total cost is $14.935667…, or $3.73 per saleable item. Compared with a $13.48 estimate, the overrun is $1.46. At $24.48 batch revenue and $3.65 fees, profit is $5.89. These defaults show how to reconcile a job; they are not an observed production record.

Keep comparable records

Use a product or file revision as the job label rather than customer details. The log records the currency and date with each entry. It does not convert currencies or create a cross-currency profit total. To correct a record, enter corrected values, save a new record, then remove the superseded one. The tracker currently models filament by mass; for resin use the resin calculator and record consumables separately.

Turn a log into a genuine case study

Keep the original slicer export, timer notes, meter readings and photos with your own records. The case-study documentation guide explains the evidence to retain. Export CSV for the current calculation or JSON for saved records; this site does not maintain a server copy.